Monday morning review, one screen with everything on it. The managing director asks whether the project will land on time; the project manager would like to show why testing slipped; the team lead needs to know who does what tomorrow. Most project dashboards fail exactly here: one page, full of charts, answering none of the three questions well.
It is not a problem of graphics, and not a problem of tooling. Those three questions belong to three different dashboards, with three audiences, three update frequencies and three levels of detail. Put them on one page and you get something the director finds unreadable and the team finds useless.
In short
- A project dashboard is designed from who looks at it and what decision they must take, never from the data you happen to have. Change the reader and everything changes: detail, frequency, horizon.
- Three types of project dashboard are useful: strategic for the leadership team (“where are we heading”), analytical for project managers and the PMO (“why are we here”), operational for the team (“what do I do today”).
- The single dashboard that serves everyone is the most common mistake: it ends up serving nobody. Three pages on one data source work better.
- The quality of a dashboard depends on the plan feeding it: without a saved baseline and a current status date the numbers are wrong, however good the graphics.
- The update frequency is decided together with the dashboard: daily for the operational one, every reporting period for the analytical one, monthly or quarterly for the strategic one.
You do not start from the data: you start from the question
The fastest way to build a useless dashboard is to start from what you have: export the whole plan, put every available column on the page, then look for a meaning. What you get is a display cabinet of numbers that nobody uses to decide anything.
The right path is the opposite one, and it begins with two questions, in this order: who will look at this page, and what decision must they be able to take after looking at it. If the answer to the second is “none, they just need to be informed”, that is not a dashboard: it is a report, and you send it by email.
Everything else follows. A managing director deciding whether to fund phase two does not need the task list: they need to know whether the portfolio holds, what the current work costs and which projects are at risk. A team lead assigning tomorrow’s work has no use for quarterly portfolio trends: they need what is late and who is overloaded. Same project, same source data, two completely different pages.

The three types, and the question each one answers
The strategic dashboard looks at the portfolio from above. Its reader is the leadership team, the sponsor, the board that decides where money and people go. It shows overall progress of the key projects, aggregate cost, schedule and quality indicators, top risks, how resources are spread across initiatives. It does not go into task detail: if after ten seconds the reader cannot tell which projects are healthy and which are not, the page has failed.
The analytical dashboard exists to explain why. Its reader is the project manager, the controller, the PMO: whoever has to account for a variance and decide the corrective action. Here you need plan against actuals, how indicators move over time, the ability to drill down to the individual task, Earned Value indices, milestone status. It is the dashboard you prepare the meeting with, not the one you project during the meeting.
The operational dashboard is the cockpit of daily work. Its reader is the team and whoever coordinates it. It shows tasks in progress, tasks that are late, workload per person, open issues, change requests waiting. It changes every day and must be readable in thirty seconds, standing in front of a screen.
Each of the three has its own article on what to put inside it: the strategic dashboard, the analytical dashboard and the operational dashboard. What matters here is the choice between the three, and what holds for all of them.
The one-dashboard-for-everyone mistake
The request always comes in the same form: “let’s build one, so we can all look at it”. It is understandable, because a dashboard costs time to build and to maintain, and three look like three times the work. But the three types do not differ in how much information they carry: they differ in level of aggregation, and aggregation is not reversible.
A dashboard that answers three different questions answers none of them: it only answers the question of the person who built it.
Here is how it plays out. To satisfy the team you add the task list, and the leadership stops opening the page because they have to scroll past two screens to find the traffic light they care about. To satisfy the leadership you add aggregate indicators, and the team ignores them because they say nothing about this morning. Three months later the only person opening the dashboard is the person who built it.
The good news is that three dashboards do not cost three times one. The expensive part is the data source: the updated plan, the extraction, the transformations. That is done once and feeds all three pages. What changes is the level of aggregation and the selection of what to show, which in a tool like Power BI are three views on the same model.
Where the numbers come from: the part that decides everything
This is the part most often skipped, and the only one that can make a dashboard harmful rather than merely useless. A dashboard does not produce information: it carries it. If the plan it draws from is badly updated, the page will show wrong numbers with convincing graphics, and somebody will make decisions on those numbers.
Three conditions, none of them optional.
- A saved baseline. Without it there are no variances: the dashboard can show where you are, never how far you have moved. Every “variance” tile built on a plan with no baseline shows zero, or a number invented by a spreadsheet downstream.
- A correct status date. Indicators are calculated against a specific date, not against “today”. A dashboard reading a plan with an empty status date changes its numbers every day without anyone entering anything.
- A periodic update on a fixed cadence, with actual dates and remaining work. That is the cycle that fills the three pages with content; how often to update is agreed at the start and then respected.

There is an organisational consequence too, worth saying before you start: a dashboard makes the quality of your updating visible. If the plan is updated in a rush the day before the meeting, the dashboard will show it, and the discussion will move to whether the data can be trusted instead of what to decide. People who introduce a dashboard without first fixing the update cycle usually abandon it within two months.
How many indicators, and which
The practical rule I use is simple: every tile must be able to change someone’s mind. If nobody would do anything differently after looking at a chart, that chart takes up space and attention and gives nothing back. Applied seriously, this rule usually halves the number of tiles in the first version.
From it follow three selection criteria, valid for all three types:
- Few indicators, always the same ones. A dashboard is worth something for its time series, not for the snapshot: changing the indicators every quarter wipes out the comparison. Five stable numbers beat fifteen that keep changing.
- A declared threshold for every traffic light. Green and red need a written rule, agreed with whoever reads the page: “red if the variance exceeds 10% of the contractual float” can be discussed, “red because it looked serious to me” cannot.
- Comparison before the absolute value. A cost index of 0.89 says almost nothing on its own; 0.89 after 0.95 and 0.92 says the situation has been deteriorating for three periods. That is the difference between a number and a diagnosis.
The mistakes I see most often
- A dashboard built on available data instead of on the decisions to be taken. You recognise it because nobody can say what to do after looking at it.
- No specific audience. “It is for everyone” means nobody owns it, and nobody reports it when a number is wrong.
- Data updated by hand in an intermediate spreadsheet. It works for two months, then somebody skips an update and the dashboard shows the past without saying so.
- Too many colours and too many chart types. Three colours with a fixed meaning are worth more than a palette. Red is used only for what requires an action.
- No visible date. Every page must state when the data is from: without that line, the reader does not know whether they are seeing yesterday or last month.
- The dashboard instead of the conversation. The page prepares the discussion and makes it shorter; it does not replace it, and it does not replace telling the right person about a delay.
The opposite case: when a dashboard is not needed
On a single short project with a team of five who talk every day, an operational dashboard is a cost with no return: the plan’s task list and a ten-minute meeting do the same job better. The same goes for an organisation running two projects a year: the strategic dashboard would be a page with two rows, and a table in an email is more honest.
Dashboards start paying off when there are more projects than you can hold in your head, when data comes from different sources, or when the same questions come back at every meeting. Before that point, building one is an elegant way of postponing the real work, which is keeping the plan up to date.
Frequently asked questions
Which of the three dashboards should I build first?
The analytical one, almost always. It is the one you need yourself to run the project, so you will actually use it and you will notice immediately when a number is wrong. It also forces you to sort out the data source, which is the work the other two rest on. The strategic one makes sense when there is a portfolio to show; the operational one when the team is big enough that coordinating by voice no longer works.
How often should a dashboard be updated?
At the same frequency as the decisions it supports: daily for the operational one, aligned with the reporting period for the analytical one, monthly or quarterly for the strategic one. Updating more often adds no information, because the underlying data has not changed; updating less often turns the dashboard into an archive.
How many indicators should fit on one page?
Few, and fixed. A strategic page works with five or six tiles; the analytical one can afford more because it is made to be explored; the operational one must fit in one screen without scrolling. The criterion stays the one above: if a tile cannot change anyone’s mind, remove it.
Do I need Power BI, or is Excel enough?
For a single project and a monthly update, Excel is plenty: a pivot table on data exported from the plan is already an analytical dashboard. Power BI, Tableau or Qlik become necessary when there are many projects, more than one source, and the update has to happen without redoing the work by hand every time. The difference is not the graphics: it is the automation of the update.
How do I get Microsoft Project data into Power BI without redoing it by hand?
The manual route exists and is always the same: export the columns you need to Excel, build the model in Power BI, and repeat the export at every update. It works, but it is the point where most dashboards die, because sooner or later the manual step gets skipped. Two tools of mine remove that step. OneClickExporter reads the Microsoft Project file and writes a set of files for Power BI with the same columns every time, so the refresh does not break; OneClickReport is the Power BI half, fourteen report pages already built on those files.
Does a dashboard replace the Gantt chart?
No, and it is worth keeping them separate. The Gantt chart is where the plan is built and updated: links, durations and the critical path live there. The dashboard is the summary reading of that plan for whoever has to decide. Replacing the first with the second leads to neglected plans and dashboards full of numbers with no foundation.
Further reading on this blog
- How to export a Microsoft Project plan to Excel without summary rows — the data under an Excel dashboard, without the rows that double the totals
- Project planner tools: what you need besides Microsoft Project
- The strategic project dashboard: what to put in it
- The analytical project dashboard: five reports and the drill-down
- The operational project dashboard: five reports for the team
- How to update a Microsoft Project plan: baseline, status date and progress
- Earned Value: the complete guide to PV, EV, AC, SPI and CPI
- One CPI is a number. Twelve are a diagnosis.
Disclosure: this is the blog of a company that makes project-control software, so take the paragraph below for what it is. Nothing in the method above requires our tools, or any tool: the three types of dashboard are a way of thinking about the reader, and a pivot table on exported data is already a working analytical dashboard.
If the manual export is what keeps your dashboards from surviving past the second month, OneClickExporter reads Microsoft Project files and writes data Power BI can refresh from, with the same columns run after run. OneClickReport is the other half: fourteen report pages already built on that data, for when you would rather not draw the three pages yourself.
#ProjectDashboards #ProjectControl #MSProject #PowerBI #PMO