Products

Products

Six desktop tools for the work Microsoft Project leaves to you

Each one solves a single job completely and is licensed on its own. They are all desktop applications: four read your schedule files directly and need no Microsoft Project licence — for the people who receive plans without owning the tool that made them — while GanttTimesheet drives Project itself and needs it installed, and GanttShield needs it only for the .mpp copy: its .xml copy works without Project.

The six tools Every one of them is a Windows desktop application, licensed on its own, and none of them lives in the Project ribbon. Four read your schedule files directly and need no Microsoft Project licence at all — GanttTimesheet needs it and says so in red; GanttShield needs it only for the .mpp copy.
Business intelligence

OneClickExporter

Feed the dashboards, reliably

The bridge to Power BI. A CSV export with stable, predictable columns, so your dashboard refreshes every month instead of breaking every month.

  • Column layout built for Power BI ingestion
  • Time-phased data included
  • Handles master plans and shared resource pools
  • One click, no export wizard

Feeds OneClickReport, the ready-made Power BI dashboards — sold separately. Open OneClickExporter

Data protection

GanttShield

Safe to send outside the company? Microsoft Project for the .mpp copy only; the .xml copy needs no Project

Every .mpp file carries client names, hourly rates, costs, baselines and the notes where the honest remarks live. One click produces a sanitized copy next to the original — which is never touched.

  • Tasks and resources become stable IDs, still referable by number
  • Costs, all 11 baselines and 30 custom fields zeroed in one pass
  • Refuses shared resource pools and master plans, on purpose
  • Structure, dates and durations stay perfectly readable

Open GanttShield

Progress collection

GanttTimesheet

Where did the hours actually go? Requires Microsoft Project installed

The whole timesheet cycle in one place: send each resource their sheet, collect what comes back, approve it line by line, and let the plan update itself. Nobody but you opens Microsoft Project.

  • Row-by-row approval — nothing reaches the plan unapproved
  • Rows matched by internal identifiers, never by name
  • Rejection with a reason, emailed back to the resource
  • Attaches to the plan you already have open

Open GanttTimesheet

Assignments

SendTask

Tell everyone what is theirs

Email every resource their own filtered task sheet, straight from your mailbox. Each person sees their work and nobody else’s — and you never open Microsoft Project to do it, because SendTask reads the plan file itself.

  • One Excel sheet per resource, sent from your own mailbox
  • Percent complete or day-by-day work, whichever you use
  • Mail profiles stored with encrypted credentials
  • No Microsoft Project licence needed, on any machine

Open SendTask

Excel export

MppToExcel

Everyone wants it in a spreadsheet

Hand the plan to people who live in Excel: a full task table plus a Gantt chart drawn in cells. Collecting their actuals back into the plan is GanttTimesheet’s job, not this one’s.

  • Four timescales, from days to quarters
  • Cost data is opt-in and never remembered between sessions
  • The workbook speaks six languages
  • Opened read-only: your plan is never touched

Open MppToExcel

Delay trend

GanttDerivata

Is the delay getting worse, or closing by itself?

A single measurement tells you how late you are. GanttDerivata compares consecutive status dates and tells you the direction — which is what decides whether you spend money today or wait.

  • Widening, stationary or reabsorbing, task by task
  • The date a delay reaches zero, calculated from its own rate
  • A four-week horizon, because that is the length of a decision
  • Executive dashboard in Excel, not a data dump

Open GanttDerivata

At a glance

Which one do you need?

Pick by the question you’re trying to answer, not by the feature list.

OneClickExporter Standalone The dashboard has to refresh on Monday, and the export keeps breaking.

OneClickExporter reads the .mpp directly — no Project licence, no COM, nothing to keep open — and produces eight CSV files with a schema that never shifts under your dashboard. Run it from the window or schedule it from the command line, on a single plan or on a whole master plan. Monday becomes a non-event.

GanttShield Project for .mpp only You’re about to attach an .mpp to an email leaving the company.

That file carries more than bars: rates, costs, notes, custom fields with names you’d rather keep inside. GanttShield works on a copy and strips exactly what you tell it to — one file at a time or several in one batch run — while the original is never touched. You decide what the outside world gets to read.

GanttTimesheet Needs Project Every week you retype progress that arrived as emails and screenshots.

GanttTimesheet imports the timesheets your resources filled in, shows you every row for approval, and writes the approved progress straight into the Project plan you already have open. No retyping, no transcription errors, and an archive that remembers each cycle after it closes.

SendTask Standalone Nobody is sure which tasks are theirs, and you send the lists by hand.

One send, and every resource receives their own assignment list — only theirs — in the format you choose. A resource with no email address in the plan is flagged, not silently skipped. SendTask is deliberately one-way: it informs your team, it never touches your plan.

MppToExcel Standalone The people who need to read the plan don’t have Project, and won’t install it.

MppToExcel turns the .mpp into a real Excel workbook: the full task table on the left, a Gantt chart drawn in cells on the right, in the timescale you pick. Your file is opened read-only and never modified, and the workbook speaks six languages. Everyone has Excel — now everyone has the plan.

GanttDerivata Standalone Two projects are both 10% behind, and you have the budget to rescue one.

The same delay can be three different stories: widening, stationary, or already reabsorbing on its own. GanttDerivata compares consecutive status dates and gives each task a direction and a date its delay reaches zero — so the budget goes to the project that won’t make it back alone.

Buying and licensing

How it works

Is there a bundle?
Not today. Every tool is sold and licensed separately, and none of them depends on the others. If a bundle would suit you, tell us which tools and we’ll put a price on it.
How are licences counted?
Per seat. Activation is done from inside the application with the key you receive by email, and you can deactivate a machine yourself when you change computer. An offline grace period means a lost connection doesn’t stop your work.
What do I need on the machine?
Windows 10 or 11. Installation is per-user, needs no administrator rights and no server components. GanttTimesheet additionally requires Microsoft Project desktop, because it drives it. GanttShield needs Project only to write the .mpp copy; the .xml copy, which Project opens, needs nothing else. The other four require nothing else at all. None of them is a ribbon add-in.
Does any of this touch the internet?
For licence activation and, in applications with an About window, for a check for new versions that sends nothing about you and can be switched off. Every tool processes your schedules entirely on your own machine: nothing is uploaded to us, and there is no account to create. SendTask and GanttTimesheet send email only when you ask them to, from the mail account you set up.
Can I try before buying?
Every application comes with a 15-day free trial of the whole thing, with nothing held back, so you can judge it on your own schedules before spending anything. If you buy and change your mind, you have 14 days to ask for your money back.
Do you invoice businesses?
Yes. Payments are handled by Lemon Squeezy as merchant of record, so VAT and business invoices are taken care of at checkout.

Not sure which one fits?

Describe how your schedules move between people — who writes them, who receives them, who has to report on them — and we’ll tell you which tool earns its place first. Or none, if that’s the honest answer. Ask us a question

Scroll to Top