Your plans are your business. Here is what we actually process.
Our tools are built so that your project data stays on your computer. This page explains, in plain language, what personal data we do process — on this website, when you buy a licence, and when our applications check that licence — and what your rights are.
Last updated: 16 October 2026
Your project files never reach us
Every Project Edge tool processes your plans locally, on your machine. Tasks, resources, costs, timesheets: none of it is ever transmitted to us or to anyone else.
Licensing needs almost nothing
Licence checks send only your licence key, your computer name and an activation identifier. The check for new versions sends nothing about you at all.
We don’t sell or share your data
No advertising, no data brokers, no “partners”. We measure visits only if you accept analytics cookies. The few providers we use are named on this page, and they work for us, not on your data.
Email means what you asked for
Write to us and we reply. Download a guide and we send product updates you can stop with one click. Neither turns you into a marketing target.
The short version above is a summary, not the policy. The full policy follows.
1. Who we are
The data controller is PMSolutions di Rizzo Rosario, Via Volvera 68/2, 10090 Bruino (TO), Italy — VAT no. 09115380017. We have not appointed a Data Protection Officer: our processing does not meet the conditions that make one mandatory under art. 37 GDPR. For anything in this policy, write to info@projectedgetools.com.
This policy covers the website projectedgetools.com, the purchase and licensing of our desktop applications (the Project Edge Tools suite, including OneClickExporter, GanttDoctor, SendTask, GanttDerivata, GanttShield and MppToExcel), and our support and product-update emails.
2. What our applications do — and do not — process
Our applications are desktop software. They read and write your project files on your computer. The content of your plans — tasks, resources, names, rates, costs, assignments, calendars, timesheets — is processed locally and is never transmitted to us or to third parties.
Our applications communicate with us for two things only: licence validation, and — in the applications that have an “About” window — checking whether a newer version exists (both in section 4). Where an application sends data elsewhere at your request — for example SendTask sending timesheets through your own mail server — that happens under your control, with your infrastructure, to recipients you choose; we receive nothing.
Any personal data contained in your project files (for example resource names) is processed by you, as its controller. We have no access to it.
3. Buying a licence
Sales are processed by Lemon Squeezy, LLC (a Stripe company) as Merchant of Record: the checkout, invoicing, taxes and payment happen on their platform, under their own privacy policy. Your card or payment details go to them, never to us.
From each order we receive what we need to issue and honour your licence:
- your name and email address;
- the product, edition and price of the order;
- your licence key and its status;
- billing country and, for business customers, the VAT details you entered.
We use this data to deliver the licence, provide support and upgrades, meet our accounting obligations, and prevent abuse of licence keys.
4. Licence activation and validation
When you activate one of our applications, and periodically while you use it, the application contacts the Lemon Squeezy licensing service (api.lemonsqueezy.com) to check that the key is valid. That check transmits exactly three things:
- the licence key;
- your computer name, used to label the activation so you can recognise it;
- the activation identifier assigned when the key was first activated.
No file content, no usage statistics and no other information about you or your machine is sent. The activation state is stored locally on your computer. If you are offline, the applications keep working for a grace period without contacting anyone.
Applications that have an “About” window also check whether a newer version exists: at start-up, at most once a day, and whenever you press “Check now”. They download a public file from our website (projectedgetools.com/download/versions.json) that lists the current version of each product. The request carries no licence key, no file content and no identifier of you or your computer; as with any visit to a website, your IP address is visible to our hosting provider, SiteGround. You can switch the check off in the “About” window, and the applications never download or install anything by themselves.
5. Writing to us
If you use the contact form or email us, we process your name, your email address and whatever you chose to write, for one purpose: answering you. Contacting us does not subscribe you to anything. We keep support correspondence so that we can follow up on earlier conversations.
The same applies to the chat window at the corner of this site. If you open it and write to us, we receive your message and whatever contact details you decide to give, for the same single purpose: answering you. You can read the site without ever touching it.
6. Guides, templates and product updates
Alongside your address we keep the technical record of the subscription itself — when you gave consent and from which request — because we have to be able to show that you asked. Every email carries a one-click unsubscribe link, and writing to us works just as well; once you unsubscribe we stop, and we keep only what proves the consent existed and was withdrawn.
Some materials on this site (guides, templates) are delivered by email. If you request one, we use your address to send it and — with your consent given at that moment — to send occasional technical and product updates. Every such email contains an unsubscribe link that works with one click. Unsubscribing stops the updates; it does not affect your licence or support.
Downloading a free trial works through a short form: we ask for your first and last name, your country and your email address, together with the product you are downloading. With your consent, given by ticking the box on that form, we use these details to send you information about the product you chose. Nothing else is added to the list, every such email carries the usual one-click unsubscribe, and you can ask us to delete these details at any time by writing to info@projectedgetools.com.
7. How we handle and protect data
Processing is carried out with electronic tools and, where it still happens, on paper. We apply technical and organisational measures appropriate to the risk — access limited to those who need it, encrypted connections, up-to-date systems — to protect data against loss, misuse and unauthorised access.
Some of the providers named below process data outside the European Economic Area. Where that happens, the transfer relies on the safeguards required by Chapter V of the GDPR: an adequacy decision, or standard contractual clauses.
8. Cookies and analytics
This website runs on WordPress and uses the technical cookies needed to operate: they keep the session alive, remember display preferences and let a form be submitted safely. Some last only until you close the browser, others stay for a limited time tied to their technical purpose. They are set automatically, without asking, because the site cannot work without them — which is exactly why the law does not require consent for these.
We also use Google Analytics 4 to understand which pages people read and how they arrive here. It tells us how many visitors a page had, not who they are: we never use it to identify you, and we do not use advertising cookies, remarketing or cross-site tracking.
Analytics cookies are only set if you agree. You are asked when you first arrive, nothing is measured before you answer, and you can change your mind at any time from the cookie settings on this site or by clearing the cookies in your browser. Refusing costs you nothing: the site works exactly the same.
The chat window loads on every page, whatever you chose about analytics, because it is how you reach us. Until you write something it sets no cookie and creates no identifier: all it leaves in your browser is a note of which corner the button sits in.
Google Analytics 4 shortens IP addresses before storing them, so we never see the full address. The data is processed by Google Ireland Limited and may reach Google LLC in the United States under the safeguards described in Google’s own privacy documentation. It is kept for the period configured in our property — at most fourteen months — after which Google deletes it.
You can also manage or delete cookies from your browser settings. Removing the technical ones may break parts of the site; removing the analytics ones costs you nothing.
9. Legal bases
Under the GDPR, we rely on:
- performance of a contract (art. 6.1.b) for orders, licensing, activation and support;
- legal obligation (art. 6.1.c) for tax and accounting records;
- legitimate interest (art. 6.1.f) for preventing abuse of licence keys and keeping our records accurate;
- consent (art. 6.1.a) for trial-download follow-ups, product-update emails and analytics cookies, which you can withdraw at any time.
10. How long we keep data
- Licence and order data: for as long as the licence can be used, plus the time needed to handle upgrades and disputes.
- Accounting records: ten years, as required by Italian law.
- Support correspondence: as long as it is useful to assist you, after which it is deleted.
- Product-update subscriptions: until you unsubscribe.
- Analytics data: kept by Google for the period set in our property, no longer than fourteen months.
11. Who else is involved
We do not sell or rent personal data, and we share it only with providers that act on our instructions:
- Lemon Squeezy, LLC (USA) — checkout, invoicing and licence infrastructure. Transfers outside the EEA rely on the safeguards described in their privacy documentation, including standard contractual clauses;
- SiteGround — hosting this website and serving its contact form;
- our email provider — delivering replies and, if you asked for them, product updates;
- Google Ireland Limited — Google Analytics 4, only if you accepted analytics cookies. Transfers to Google LLC in the United States rely on the safeguards described in Google’s privacy documentation.
- Mailshake, LLC dba Helploom (USA) — the chat window on this site and the messages you send through it. Transfers outside the EEA rely on the safeguards described in their privacy documentation.
Beyond these, data leaves us only if the law requires it.
12. Your rights
You can ask us at any time to access, correct, delete or export the personal data we hold about you, to restrict or object to its processing, and to withdraw any consent you gave. Write to info@projectedgetools.com; we answer within the terms set by the GDPR.
If you believe we are processing your data unlawfully, you have the right to lodge a complaint with your supervisory authority — in Italy, the Garante per la protezione dei dati personali (garanteprivacy.it).
13. Automated decisions and minors
We make no automated decisions about you and we build no individual profile: the analytics described above are read as aggregate figures, never to single anyone out. Our products and this website are aimed at professionals and are not directed at children.
14. Changes to this policy
If we change this policy, the new version is published on this page with an updated date. Substantial changes affecting licence holders are also announced by email.