Your Microsoft Project plan, in Power BI, in Excel and in your systems, in one click.
OneClickExporter reads .mpp files directly — a single plan, a master plan with all its subprojects or a whole folder of plans — with no Microsoft Project installed, and writes a clean set of CSV files whose columns never move: tasks, resources, assignments, time-phased data and earned value. Power BI reads them, Excel reads them, Qlik and Tableau read them, your ERP imports them; JSON and an Excel workbook too, if you want. Pick the plan or the folder, press Export, and whoever reads the data finds it current.
- 15-day free trial, portable: no key, no install
- No Microsoft Project needed
- Stable columns: reports and imports don't break
- Earned value, time-phased
- Master plans & resource pools
- Command line for nightly exports
Getting data out of Project is a weekly job — and a right-now one
Microsoft Project holds the plan; the organisation wants to see it somewhere else: in a Power BI dashboard, an Excel workbook, Qlik or Tableau, the ERP that books the actuals. Between the two sits a manual export nobody enjoys, and it does not come round on a calendar: it is the Monday review, the sponsor's question on Wednesday, the figure somebody needs before a four o'clock meeting. Every single time, the columns come out slightly different — so the report or the import that worked last time quietly breaks.
The export by hand
Copying fields out of Project, reshaping them, saving CSVs in the right layout — a fiddly job repeated at every reporting cycle.
The report that breaks
A renamed column or a shifted order and the dashboard, the workbook or the ERP importer can’t find its fields. The report is red on the morning it’s needed most.
Master plans left out
A hand export of a master plan with subprojects and a shared resource pool is hard to get right, so the consolidated view never gets built.
Up to ten CSVs, for whatever tool reads them
Open a plan, a master plan or a folder of plans, choose what you need, press Export data (the steps, one by one). Out come clean, predictable files — the same columns in the same order, every time. That stability is a contract rather than a habit, and it is what keeps an old importer alive: how to feed a system that predates APIs.
The whole plan, split cleanly
Projects, tasks, assignments, resources and milestones, each in its own file — the shape a proper data model wants, in Power BI as in Qlik, Tableau or the Excel data model, not one flat sheet.
Earned value, ready to chart
Consolidated earned value on the project header, plus a time-phased daily curve per project — the S-curve is a chart, not a calculation you have to rebuild.
Time-phased detail
Assignments and resource availability distributed across days and weeks, so cost, work and over-allocation can be read over time, not just as totals.
Master plans and resource pools
Nested subprojects and shared resource pools are handled and consolidated, so a whole programme exports as one coherent set of files.
Byte-identical, run after run
The output is checked against golden files across standalone, master-plan, resource-pool and time-phased scenarios, so the same plan always exports the same way.
A governance scorecard, every time
One row per project with the plan’s last save and author, status date, whether a baseline was ever taken — and the counts that give a PMO pause: tasks that should have started, percentages with no actual dates, tasks with no links, hard constraints, resources with no rate. Facts, not verdicts: the thresholds are yours to set.
Pick what you export
Some files are produced only when you switch their option on, so you export exactly the data your report uses and nothing you don’t.
The format the receiver expects
Comma, semicolon or tab as the delimiter; UTF-8 with or without a BOM, so Excel reads accented characters correctly; ISO dates and a decimal point whatever the Windows language. And, when needed, JSON and an XLSX workbook too.
An open format, chosen on purpose
CSV is the format every analysis tool can read and even a twenty-year-old system can import. Power BI is one destination, not the only one.
Power BI
Build your own model on the files, or use the ready-made OneClickReport dashboards, below.
Excel
Power Query and the data model connect the same files: we rebuilt the OneClickReport dashboards in an Excel workbook fed by the same CSVs.
Qlik, Tableau and the rest
They read CSV and have data-modelling tools on a par with Power BI's, if not better. Separate tables and ISO dates are what they expect.
Business and legacy systems
ERP, timesheets, data warehouse: their importer wants a file that never changes shape, and here name, columns and order stay put. How to feed a system that predates APIs.
Pipelines and applications
The JSON output gives one file per table with the types already right; with the command line, Project data enters an automated process.
The dashboard is already built
OneClickExporter produces the data. OneClickReport is a separate kit that consumes it: a Power BI file with the dashboards already built on these exact CSVs, plus a toolkit for adding your own on the same data schema. You don't need it to use OneClickExporter — but with it there is nothing left to wire up.
Pick the plan, the programme or the folder
A single .mpp, a master plan that brings all its subprojects along, or a whole folder of plans that becomes a single dataset. OneClickExporter reads the files itself — nothing has to be installed, launched or waited for.
Press Export data
Choose the options you need and export. The CSVs land in your destination folder in seconds, with a consistent layout.
Refresh the dashboard
Open the OneClickReport .pbix and refresh. Progress, cost, resources, milestones and earned value are already wired up. OneClickReport is licensed separately, at €99, one-off.
It reads your plan, it doesn’t change it
An exporter, not an editor
It reads the plan and writes CSV files. It doesn’t write anything back to your .mpp, so there is nothing it can break in the source.
Everything stays on your machine
The export runs locally and reads the file itself. The CSVs are written to a folder you choose; nothing is uploaded anywhere.
Minutes become seconds
Because nothing has to be driven through Project, a real master plan that used to take around twenty-five minutes now exports in seconds — and you can leave the plan open in Project while it runs. What comes out is the plan as it was last saved, so save before you export.
Tested against known-good output
A golden-file suite pins the export byte-for-byte across the tricky cases — master plans, resource pools, time-phased data — so behaviour doesn’t drift between versions.
The same export, without anyone clicking
Next to the application there is OneClickExporter.Cli.exe: the same engine, no windows, made for Windows Task Scheduler. Point it at a plan or at a folder, and tomorrow morning the files are already current for whoever reads them: the dashboard, the Excel workbook, the ERP import. There is a longer account of what that changes for the people who read the report: the nightly job your PMO never had.
OneClickExporter.Cli export "C:\Plans\Masterplan.mpp" --destination "C:\Data\Projects" --pool --milestones --timephased 2026 2027A plan, or a whole folder
Give it one .mpp or a folder: every plan at the folder’s top level goes into one dataset, the way a master plan would. Useful when each project manager drops their file in a shared folder.
Every option the window has
Resource pool, milestones, time-phased data, earned value, preliminary works, delimiter and BOM, plus --json and --xlsx next to the CSVs. Messages come in the same six languages as the application.
Exit codes a scheduler can read
0 done, 1 done with warnings, 2 something wrong in the plan, 3 licence, 4 wrong parameters. Your scheduled task knows whether to alert you, instead of failing quietly.
Unzip it and run it. Fifteen days, no key.
There is a portable package next to the installer: unzip it and it runs for fifteen days without a licence key, command line included. No administrator rights, and no card details asked for.
No approval needed
It runs from your own folder or a USB stick — which on a managed laptop is usually the difference between evaluating it and not.
No project limit
The trial runs the unlimited edition: every function, the command line included, on as many projects as your master plan holds. In the exported data the project name ends with [TRIAL] until you activate a key.
Windows may say it does not recognise this program yet. Check that the publisher is Rosario Rizzo — every file in the package is digitally signed.
A licence that scales with your master plans
One seat, one year, and the only thing that changes is how many projects you can export at once. Pick the level that matches your programmes.
Your purchase price is guaranteed for life, even if the subscription price increases.
- Export up to ten CSVs in one click, JSON and XLSX too
- Consolidated and time-phased earned value
- Master plans and shared resource pools (from Master Plan 5)
- Command line for scheduled exports
- Every update released during your licence year
- Email support
[TRIAL]. If you buy and it isn't what you needed, ask within 14 days and you get your money back.Prices exclude VAT. Payments handled by Lemon Squeezy as merchant of record: business invoices and VAT are taken care of at checkout.
What everyone asks
Can I try it before buying?
[TRIAL] at the end of the project name in the exported files, which disappears once you activate a key. And if you buy and change your mind, you have 14 days to ask for a refund, no questions asked.Do I need Microsoft Project installed?
.mpp file directly. Project doesn’t have to be installed, and it no longer matters which version or interface language you have. If Project is installed you can leave the plan open in it while the export runs — the file on disk is what gets read, so save the plan first and what you export is what you see.Can I export a plan I received from someone else?
.mpp directly: a plan sent by a contractor, a client or a PMO can be exported on a machine that has never had Microsoft Project on it.Are the numbers the same as Project’s?
Do I need Power BI?
Can I use it with Excel, Qlik or Tableau?
Will the export change my plan?
.mpp, and nothing is uploaded anywhere.Why not just use Project’s own export?
Does it handle a master plan with a resource pool?
Which licence level do I need?
What exactly comes out?
Stop rebuilding the same export every time someone asks.
Point OneClickExporter at your plan and press Export, or let the command line do it every night. The columns stay put, so reports and imports keep working.
- Windows 10 / 11
- A
.mppor Microsoft Project XML file — Microsoft Project not required - Power BI Desktop only for the OneClickReport dashboards
- Version 3.2.8 — released 14 October 2026