MPP To Excel

Windows desktop · reads .mpp directly

Hand your plan to the people who live in Excel.

MppToExcel turns a Microsoft Project plan into a clean workbook — a full task table and a Gantt chart drawn in cells — reading the .mpp file straight from disk. No Project licence needed to open the file.

  • Your file is opened read-only
  • Cost data is opt-in
  • Your .mpp file is never modified

Why it matters

The people who need the plan don’t have Project

Site managers, clients, subcontractors, finance — they all need to read the schedule, and almost none of them own a Microsoft Project licence. So the plan gets flattened into a spreadsheet by hand, every reporting cycle, and the next one never looks quite like the last.

The plan rebuilt by hand

Someone copies tasks, dates and durations into a spreadsheet every week, because that is the only format the rest of the team can open.

No Gantt they can see

A table of dates is not a schedule. Without the bars, the reader can’t see what overlaps, what’s late, or what’s coming next.

Rebuilt again next month

A workbook assembled by hand is never the same twice: columns move, formats drift, and whoever reads it has to work out what changed before they can use it.

The export

A real workbook, not a flat dump

Open an .mpp file and get a single Gantt sheet that a spreadsheet person can actually use.

A full task table

Fifteen columns: IDs, names, dates, durations, resources, predecessors, percent complete, actual dates, and Work / Actual Work / Remaining Work in hours.

A Gantt drawn in cells

The timeline is real Excel cells, not a pasted picture. Non-working days are shaded from the project calendar, so the bars line up with reality.

Four timescales

Days, weeks, months or quarters — pick the zoom that fits the audience and the length of the job, and the whole sheet re-scales.

Straight to Excel, or saved

Hand the workbook to Excel on screen, save it silently as .xlsx, or both. Overwriting an existing file always asks first.

Cost data is opt-in

The «Include cost data» box always starts unticked and is never remembered. Leave it off and no economic value leaves the file.

Your original is safe

The source plan is opened read-only, inspected, and closed without saving. The export never writes back to the file it read.

The MppToExcel main window in English, Base edition: the command bar on the left, three numbered steps — choose the .mpp plan file, pick the Gantt timescale, choose the output — and in step 3 the Pro options greyed out and marked (Pro), with the Columns and filters button disabled
Main form of MppToExcel in the English version

Try it

Unzip it and run it. Fifteen days, no key.

Besides the installer there is a portable package: a folder you unzip and open, with fifteen days of every function from the first launch. No administrator rights, nothing to register, nothing left behind.

No approval needed

It runs from your own folder or from a USB stick, which is often the only way to evaluate anything on a corporate laptop.

The Pro edition, not a demo

The trial runs the full Pro edition: every sheet, every column, every filter. You decide which edition you need after you have seen both at work.

Your plan is only read

The .mpp file is opened read-only and never modified, so you can point it at a real schedule without thinking twice.

What you need, and what happens after. Nothing has to be installed: neither Microsoft Project nor Microsoft Excel. The plan is read straight from the .mpp file and the workbook is written directly as an .xlsx file; Excel, or any program that opens .xlsx files, is needed only to look at it. After fifteen days, without a licence the export stops until a key is entered; the key activates the same copy, and nothing is deleted.

Download the free 15-day trial Portable for Windows x64 — unzip and run, no installation. About 54 MB: the .NET runtime travels inside the package, so nothing else needs to be on the machine. New to portable packages? Read the step-by-step guide: every screen from the download button to your first export.

Windows may say it does not recognise this program yet. Check that the publisher is Rosario Rizzo — every file in the package is digitally signed.

What you will see, and how to verify it yourself

The Pro edition

What Pro adds, on screen

Three windows from the product as it ships, not a mock-up. The badge next to the title says which edition is running: with a Base licence the same options are still there, greyed out and marked «(Pro)», so you can see what the other edition does before you decide.

The MppToExcel main window running the Pro edition: the Pro badge next to the title, the command bar on the left, and in step 3 the Pro options — cost data, the Who does what when sheet, the cost curves sheet (it unlocks with cost data), the resource load sheet and the milestones sheet.
The main window in Pro: the five optional sheets of step 3 are available, and the button at the right opens columns and filters.
The Sheet columns window of MppToExcel, Columns tab: the list of exportable columns with tick boxes, the Move up and Move down buttons, and the counter reading 8 of 30 columns.
Thirty columns to pick from, in the order you choose. Here, eight of them — the counter says so.
The Sheet columns window of MppToExcel, Filters tab: open tasks only, milestones only, a branch by outline number, a resource, and a date window with the Next 2 weeks and Next 3 weeks buttons.
Export a part of the plan: open tasks, milestones, one branch, one resource, or the next two weeks.

Price

Two editions, one key apart

Base gives you the Gantt sheet with no task limit. Pro adds what you need when the workbook leaves your desk: cost data, four extra sheets, the columns you choose and the export filters. Microsoft Project is not required — the .mpp file is read directly — and neither is Excel: the workbook is written as an .xlsx file and opens in whatever you use for spreadsheets.

Your purchase price is guaranteed for life, even if the subscription price increases.

Base

The plan in Excel, with no task limit €79/ seat / year

  • Export to Excel with a Gantt drawn in cells
  • Full 15-column task table, four timescales
  • Non-working days shaded from the calendar
  • Reads the .mpp file directly, no Project needed
  • Critical path checked by recalculating the schedule, not by trusting the stored flag
  • Six languages, and a portable edition
  • Your plan opened read-only, never modified

15 days to try it, 14 days to change your mind. The trial runs the full Pro edition on your own plans. If you buy and it is not what you needed, ask within 14 days and you get your money back. Buy Base

Everything included

Pro

For the workbook you hand to someone else €179/ seat / year

  • Everything in Base
  • Cost data: the Cost and SIL/SAL columns, off by default and never exported by accident
  • Who does what when: one row per assignment, plus a ready-made pivot table
  • Cost curves: baseline cost, cost and actual cost period by period, with the chart already drawn
  • Resource load: hours per resource and period, with a heat map, busiest first
  • Milestones sheet: the baseline date next to the current one, and the variance with its sign
  • Choose your columns: which ones and in what order, outline levels and baseline comparison included
  • Export filters: open tasks, milestones, one branch, one resource, or a date window

The 15-day trial is Pro. Nothing held back, on your own plans, before you decide which edition you need. Refunds within 14 days of any charge. Buy Pro

Prices exclude VAT. Payments handled by Lemon Squeezy as merchant of record: business invoices and VAT are taken care of at checkout.

FAQ

What everyone asks

Can I try it before buying?
Yes, and without a licence key: there is a separate portable package that runs for 15 days from first launch with every function active. Unzip it, use it, and if you buy, the same copy activates with the key — nothing to download again. When the fifteen days are over the export stops until a licence key is entered; nothing is deleted, and your files are not touched.
What is the difference between Base and Pro?
Base is the Gantt sheet with no task limit: the task table, the cell-drawn chart, the four timescales, six languages. Pro adds what the workbook needs when it leaves your desk: the cost data columns, four optional sheets (assignments with a pivot table, cost curves, resource load, milestones), the choice and order of the table columns, and the export filters. It is the same program and the same download — the licence key decides which edition runs.
Can I start with Base and move to Pro later?
Yes, and there is nothing to reinstall. Buy a Pro licence, enter the new key in the Licence window of the copy you already have, and the Pro options switch on. Your settings stay where they are. With a Base licence the Pro options are still visible in the main window — greyed out and marked «(Pro)» — so you can always see what the other edition does.
Does it write anything back into the plan?
No. MppToExcel only exports: it reads the .mpp file and writes an Excel workbook, and it never opens or changes your plan. Turning progress from a spreadsheet back into Microsoft Project is a different product, GanttTimesheet.
What do I need installed?
Windows 10 or 11 (64-bit), and nothing else. Microsoft Project is not required: the plan is read straight from the .mpp file. Microsoft Excel is not required either: the workbook is written directly as an .xlsx file. To open the result you need Excel, or any program that reads .xlsx files.
Does the person receiving the workbook need Project or special software?
No. It is a normal .xlsx file: Excel opens it, and so does anything else that reads .xlsx. The Gantt is drawn with coloured cells rather than as a picture, so it survives wherever the file is opened.
Will costs and margins end up in the file I share?
Only if you choose. The «Include cost data» box starts unticked every time and is never remembered. Leave it off and no cost columns are written.
How do you know the critical path is right?
The flag stored in the file is compared with a fresh recalculation of the schedule. Where the two agree, the bar is red. Where they disagree the task is drawn as non-critical, and the number of unconfirmed tasks is stated in the line at the top of the sheet: better a declared doubt than a wrong red. Measured on 22 plans and 1,584 leaf tasks: the stored flag alone is wrong on 219 tasks, the recalculation alone on 103, and where the two agree, on none.
Does it work on a master plan?
Yes. The file is read as it is on disk, inserted subprojects included — and if one of them cannot be opened (moved, renamed, on a drive that is off) its tasks are missing from the sheet, so the file name is stated in the line at the top: a whole project disappearing has to be visible. Note that the export reflects the last saved version of the plan: if it is open in Project with unsaved changes, save it first.

Give everyone the plan in the format they already use.

Export it to Excel with a Gantt they can read, in the layout they already know — and get the same workbook next month, not a new one to decipher.

  • Windows 10 / 11
  • Any .xlsx reader, to open the result
  • Neither Microsoft Project nor Microsoft Excel is required
  • Version 1.3.0 — released 16 October 2026