Approved
SendTask is now approved for your organisation. The grant was recorded by Microsoft before you were sent to this page. Nothing else is required from you.
You have just approved SendTask on behalf of your organisation. This page exists because the approval flow used to end on a browser error — technically harmless, but a poor thing to see right after authorising an application you had never met.
What you granted
| Application (client) ID | a886ce79-1df6-4535-964c-d6d4a3b477a0 |
| Publisher | PMSolutions di Rizzo Rosario — verified publisher |
| Permission | Mail.Send — delegated |
| Permission | User.Read — delegated |
| Application permissions | none |
Delegated only. SendTask acts as the signed-in user and can do nothing that user cannot already do. It cannot reach another mailbox, it cannot run unattended, and it holds no client secret or certificate. Mail.Send sends as the signed-in user, and the message lands in that user’s Sent Items. SendTask does not read mail: Mail.Read is not requested.
If you approved on the Italian consent screen
Microsoft renders User.Read in Italian as «Accedi e leggi il profilo di un altro utente», which reads as though the application could read other people’s profiles. It cannot. That would be User.Read.All, which is not requested. User.Read returns the signed-in user’s own profile, and SendTask uses it for one purpose: to show which address is connected. The English wording, Sign in and read user profile, is the accurate one.
What happens next
Tell the person who asked for the approval to open SendTask and sign in again. Their sign-in will now complete, and it will keep working for everyone else in the organisation without repeating this step.
You can see the grant at any time in Microsoft Entra ID → Enterprise applications → SendTask.
What is stored, and where
Nothing on our side. SendTask is a desktop application: it is installed per user, it needs no administrator rights, and the sign-in stays on that user’s own machine.
| Path | Content |
|---|---|
C:\SendTask\msal-<user>.cache | The MSAL token cache, encrypted with DPAPI under the current Windows user. Not portable to another user or machine. |
C:\SendTask\SendTaskProfiles.xml | Profiles. In Microsoft-account mode it holds no password — only the address last signed in, as a reminder. |
C:\SendTask\Logger*.txt | Diagnostic log, current day plus the previous three. No tokens, no passwords. |
The sign-in opens in the user’s default browser, so every Conditional Access policy, MFA method and device-compliance rule you enforce applies unchanged. Outbound traffic is HTTPS to login.microsoftonline.com and graph.microsoft.com.
How to withdraw the approval
Entra ID → Enterprise applications → SendTask → Permissions, then review or delete the application. Users’ local sign-ins stop working at the next token refresh. Deleting the cache file on a single machine, or pressing Disconnect inside SendTask, removes that one sign-in without touching the tenant-level grant.
One prerequisite worth checking
Once SendTask sends through Graph, the mail leaves through Exchange Online. If your mailboxes are on Microsoft 365 but your domain’s outbound mail goes through another provider, your SPF record may not authorise Microsoft, and recipients will reject the messages with 550 5.7.23 ... SPF check failed. The application is not involved: Graph accepts the message and Exchange Online sends it, and the rejection comes from the receiving side.
Note that SPF allows at most ten DNS lookups: adding a mechanism to an already crowded record can push it into permerror and break mail from your other senders too. Count before you edit.
The full briefing
One page covering everything an IT department is asked to decide — permissions, SPF, what is stored, network, components — is available on request at info@projectedgetools.com. The product page is here.
SendTask is published by PMSolutions di Rizzo Rosario, a Microsoft verified publisher.