Your .mpp file says more than you think.
Client names in task titles, resource names and hourly rates, costs, baselines, private notes. Microsoft Project has no “share safely” button. GanttShield is that button.
- Your original is never modified
- 100% local, nothing uploaded
- One click, from its own window
Every .mpp file is a database of your business
What you see on the Gantt chart is the tip of the iceberg. Underneath, the file carries data you would never have attached to an email. What a plan carries about the people in it is worth reading before you attach one.
Task names
They reveal clients, vendors and projects you haven’t announced yet.
Resource names
These are personal data. Sharing them is processing under the GDPR.
Rates and costs
Actual costs, fixed costs, assignments: your margins, in plain sight.
11 baselines
The history of your estimates: what you predicted, and by how much you missed.
Private notes
The most unpredictable leak surface in the file: this is where the honest remarks live.
30 custom fields
Cost1–10 and Number1–20, often forgotten and full of sensitive data.
Five operations, a single pass
Choose what to scrub and get a _Cleaned.mpp copy, or a _Cleaned.xml one with no Project needed, next to the original — ready to attach, demo, or publish. On the resources there is a choice to make first: send the workload without sending the people.
Obfuscate task names
Every task becomes a stable ID — TASK-000214 — so reviewers can still reference tasks by number. Structure, dates and durations stay intact.
Anonymize resources
People become neutral codes — RES-0007. Workload conversations stay possible; personal data stays home.
Reset financial data
Costs, actuals, fixed costs, work figures, assignments, all 11 baselines, plus Cost1–10 and Number1–20 custom fields, zeroed in one pass.
Clear all notes
The place where the comments that should never leave the company end up, emptied completely.
Strip dependencies (optional)
Remove predecessors and successors while pinning every task to its original dates. The recipient sees when, not why.
Final report
A final summary on screen tells you exactly how many tasks and resources were processed, and flags any clean-up step that failed. A diagnostic log on your PC keeps the details for support.
Guarantees before features
A tool that touches your plans has to be predictable. GanttShield would rather refuse a file than process half of it.
The original is never modified
It is opened read-only and never saved. The clean copy is a new file, written from scratch: there is no code path that writes to your source file.
Resource pool protection
Files connected to a shared resource pool are refused, so company-wide data can’t be damaged by accident.
Master plan detection
Files with inserted subprojects are refused with a clear message, rather than being half-processed.
Nothing leaves your machine
Sanitization is entirely local. The network is only used to verify your licence, with a seven-day grace window so you can keep working offline.
Three steps, under a minute
Open GanttShield
It is a Windows application of its own, not a tab inside Project. No server, no components to administer.
Choose what to scrub
Tasks, resources, financial data, notes, dependencies: switch on only what that particular recipient should never see.
Get the clean copy
You’ll find YourPlan_Cleaned.mpp, or YourPlan_Cleaned.xml, next to the original, and the final report on screen. Ready to attach.
Every time a plan leaves the building
- Sending plans to consultants, vendors and partners
- Attaching a reproducible file to a Microsoft support ticket
- Building demo and training material
- Sharing planning samples in tenders and RFPs
- Publishing screenshots of real Gantt charts on blogs and social media
- Turning finished projects into reusable templates
Unzip it and run it. Fifteen days, no key.
GanttShield comes as a portable package as well: a folder you download, unzip and open. No installer, no administrator rights, nothing left behind when you delete it — and fifteen days with every function active, from the first launch.
No approval needed
On a locked-down laptop you often cannot install anything. The portable version does not ask: it runs from your own folder, or from a USB stick.
The whole product, not a demo
Every sanitisation option is there, batch mode included. What you judge in fifteen days is exactly what you would buy.
Your original is never touched
GanttShield never saves over your file: the clean copy is a new one. Trying it on a real plan is safe, which is the only way to judge the result.
Microsoft Project is needed only for the .mpp copy. To write _Cleaned.mpp, GanttShield drives Microsoft Project, so Project must be installed on the same machine. Without it, GanttShield writes the clean copy as Project XML (_Cleaned.xml), which Project opens as a normal plan and can save as .mpp. When you buy, the key activates the copy you already have.
Windows may say it does not recognise this program yet. Check that the publisher is Rosario Rizzo — every file in the package is digitally signed.
What you will see, and how to verify it yourself
Annual subscription, updates included
One licence, one seat, one year. Try the whole thing for 15 days first — and if you buy and it is not what you needed, you have 14 days to ask for your money back.
Full License
All features. One-year licence.
€79/ year (per seat)
- Any
.mpp, any size — no cap on tasks - Access to all features
- Best for: PMs, PMOs and consultants
- Priority email support
- Regular updates included
Prices exclude VAT. Multiple licences are available — get in touch for volume pricing.
Payments are handled by Lemon Squeezy as merchant of record: business invoices and VAT are taken care of at checkout.
What everyone asks
Can GanttShield damage my original file?
_Cleaned.mpp or _Cleaned.xml, is a new file written from scratch.Do I need Microsoft Project installed?
_Cleaned.xml file opens in Project as a normal plan and can be saved as .mpp. If Project is not installed, XML is the only output offered.Can the recipient reconstruct the original names?
Does it work with Project for the web or Project Online?
Does it work with master plans or files connected to a resource pool?
Is anything uploaded to a server?
What happens right after purchase?
What happens when my subscription ends?
Can I use it on a second computer?
Is GanttShield the same product as Project Scrubber?
projectscrubber.com still works and lands here.Exactly what goes: resource rates, the A–E cost rate tables, and all the baselines?
What gets sanitized, exactly
The tables below are read from GanttShield’s code, not from a brochure: for every field, what it holds, what the program does with it and which option governs it.
There are five options in the window — Task names, Resource names, Notes, Financial data, Dependencies — plus one with no switch, the document properties, which are always cleaned: a piece of data that identifies the author or the company has no reason to survive a sanitization.
Project: row 0 and file properties
The revision number and the creation and last-save dates are left on purpose: they say when, not who.
| Field | What it holds | What GanttShield does | Option |
|---|---|---|---|
| Name of row 0 (project summary) | The plan title shown in row 0 | Becomes PROJECT-SANITIZED | Task names |
| Notes of row 0 | Free-text project notes | Emptied | Notes |
| % Complete, % Work Complete, Cost, Actual Cost (row 0) | Values rolled up from the children | Best-effort reset; they go to zero anyway once the tasks are reset | Financial data |
| Fixed Cost (row 0) | Cost not tied to resources | Set to zero | Financial data |
| Cost1–Cost10, Number1–Number20 (row 0) | Custom cost and number fields | Set to zero | Financial data |
| Title, Subject, Author, Keywords, Comments, Template, Last author, Category, Manager, Company, Hyperlink base, Content status, Content type, Document version | File properties (File › Info › Properties) | Emptied; the Title also through the project’s direct property | Always |
| Custom document properties | Entries added by the company: job code, cost centre, client… | Deleted, not emptied: even the property’s name is information | Always |
| “Remove personal information on save” | A Project option that persists in the file | Switched on: whoever receives the plan does not reintroduce their own data by saving | Always |
| Baselines: Baseline and Baseline1–10 | The snapshots of the plan: planned dates, work and costs | Cleared with Project’s own command, for every task | Financial data |
Tasks
Structure, dates and durations are not touched.
| Field | What it holds | What GanttShield does | Option |
|---|---|---|---|
| Name | Task description | Becomes TASK- followed by the six-digit unique ID | Task names |
| Notes | Free text per row | Emptied on every row | Notes |
| Type | How Project balances duration, work and units | Forced to “Fixed Duration” on non-summary tasks, to protect durations while work is zeroed | Financial data |
| Effort driven | Whether adding resources shortens the duration | Switched off | Financial data |
| % Complete, % Work Complete | Progress | Set to zero | Financial data |
| Work, Actual Work, Remaining Work | Hours planned, spent, remaining | Set to zero | Financial data |
| Fixed Cost | Cost not tied to resources | Set to zero | Financial data |
| Cost, Actual Cost | Calculated totals | Best-effort reset; they go to zero anyway once work and resources are removed | Financial data |
| Cost1–Cost10 | Custom cost fields | Set to zero | Financial data |
| Number1–Number20 | Custom number fields | Set to zero | Financial data |
| Predecessors, Successors | The logical links between tasks | Emptied; the start date is kept with a “Start No Earlier Than” constraint (automatic tasks) or rewritten directly (manual tasks) | Dependencies |
Resources
With “Financial data” on, resources are deleted before any renaming. Without it only the name changes: rates, e-mail, group, initials and resource notes stay in the file.
| Field | What it holds | What GanttShield does | Option |
|---|---|---|---|
| The whole resource | Name, rates, calendar, e-mail, group: everything | Deleted from the plan, with everything it holds | Financial data |
| Name | Name of the person or equipment | Becomes RES- followed by the four-digit ID. Only when “Financial data” is NOT selected: otherwise the resource has already been deleted | Resource names |
Assignments
Project deletes the assignment together with the resource: that is how assignments leave the plan.
| Field | What it holds | What GanttShield does | Option |
|---|---|---|---|
| All assignments | Who works on what: units, work, costs and assignment dates | No field is touched directly. With “Financial data” they disappear together with the deleted resources; without it, they stay intact | Financial data |
What is never touched: start and finish dates, durations, project calendars, custom text, flag, date, duration and outline code fields (Text1–30, Flag1–20, Date1–10, Duration1–10, Outline Code1–10), task hyperlinks, WBS, the names of views, tables and filters. If confidential data lives in one of these fields, remove it by hand before sharing.
Two clarifications. Constraints stay as they were, except with the “Dependencies” option: once links are removed, every automatic task gets a “Start No Earlier Than” constraint on its original start date, and that date is rewritten unchanged. Resource calendars leave the plan together with the resources deleted by “Financial data”; the project’s base calendars are not touched.
Master plans and files linked to a resource pool are refused before anything starts, with a clear message. The final report counts every failed operation: if the number is not zero, the file may still contain sensitive data, and it says so.
Next time you attach an .mpp file, attach the right one.
One click, and the plan is ready to share: readable for whoever receives it, silent about everything that should stay yours.
- Windows 10 / 11
- Microsoft Project desktop (Standard or Professional) for the .mpp copy; not needed for the .xml copy
- Installs as a normal Windows application, per user, no server components
- Version 1.2.2 — released 14 October 2026