Two projects, both 10% behind. One needs money today. The other needs nothing.

Every reporting tool measures how late you are, once, at a status date. GanttDerivata measures how that lateness is moving — and the direction tells you something the size never will: whether the plan was wrong, whether something external pushed it, or whether it is already fixing itself. It reads the .mpp file directly, so you do not need a Microsoft Project licence to use it.

No licence required

You do not need Microsoft Project to read a plan

GanttDerivata opens .mpp files on its own. That matters more than it sounds: the people who most need to know whether a delay is getting worse are usually not the ones who built the schedule, and almost never the ones holding the Project licence.

One application

Open the file, read the trend

A Windows application that opens the .mpp you were sent and reads it directly. Nothing to install inside anything else: no Microsoft Project, no add-in, no server.

Nothing leaves

The plan stays on your machine

The file is read locally and never uploaded. Whoever sent you that schedule does not need to know you opened it, and your IT department has nothing to approve.

Site and works managersJudge the contractor’s progress without owning their planning tool.
Clients and ownersRead the plan you are given, on your own terms, before the progress meeting.
SubcontractorsSee where the master schedule is drifting and what it means for your window.
PMO and controlsRun the same reading across every plan that lands, whoever produced it.
The problem

A single measurement can’t tell you what to do

Take a snapshot today and three completely different situations look identical: a task that is 10% behind and accelerating, one that has been stuck at 10% for a month, and one that was 26% behind and is closing the gap. Same number. Opposite decisions.

Consequence

Money spent where it wasn’t needed

Overtime authorised, a second crew mobilised, a supplier pushed — on a task that was already recovering on its own and would have caught up anyway.

Consequence

Structural errors left to compound

A duration that was wrong from day one doesn’t announce itself. It just widens, quietly, until the finish date moves and the recovery options have expired.

Consequence

Blame in the wrong place

A delay caused by a late client approval looks exactly like a delay caused by an underperforming team — until you look at how it moves over time.

Where it pays for itself

The recovery date, calculated instead of hoped for

Once you know the rate at which a delay is closing, the date it reaches zero is arithmetic, not optimism. This is the number that decides whether you spend. The measure underneath it is public work, with limits worth knowing: what Earned Schedule measures, and what it cannot see.

recovery rate  = 5% per week residual delay = 20% → back on schedule in exactly 4 working weeks

If your contractual milestones can absorb four weeks, the decision is to add nothing: no extra crew, no authorised overtime, no expedited supplier. The project reaches punctuality on its own, at no cost. If they can’t absorb it, you now know precisely how much time you have to buy — rather than buying insurance against a number nobody measured. The whole argument, arithmetic included: the cheapest decision is to do nothing.

The horizon

Four weeks, because that is the length of a decision

For every task GanttDerivata carries the expected progress, cost, revenue and work forward across the current week and the three that follow. Today’s variance is always measured against a figure that was written down before the week began — and four weeks is far enough ahead to move a crew, renegotiate a delivery or reset an expectation, while still being close enough to be believed.

SPI

Are we on time?

Work achieved against work planned. Below 1 the project is behind, whatever the Gantt chart looks like.

CPI

Are we spending well?

Value earned against money spent. It exposes the job that is on schedule only because it is burning budget to stay there.

MARGIN

What will we actually make?

Projected final margin, from costs and revenue phased across the horizon. Not the margin you quoted — the one the current run rate is heading towards.

Beyond the trend

Three things you get with it

The delay trend is the reason to buy it. These are the three that make it usable on Monday morning.

What-if on the dates

One slider — the pace of future progress — and you see the effect at once on the estimated finish, the gap against the schedule and the delay against the baseline, using Earned Schedule. It needs a saved baseline and a status date, and it works even on plans that are only bars: without baseline cost and work the pace is computed on durations, and the window says so.

A Power BI ready JSON

Next to the CSV every export writes a canonical JSON — decimal points, ISO dates — meant to be read straight into Power BI or anything else, without a spreadsheet in the middle.

An Excel dashboard, already built

An .xltx template that hooks onto the exported file and shows progress, variance and earned value indicators. Open it, point it at the CSV, and the charts fill themselves.

The output

An executive dashboard, not a data dump

The analysis lands as an Excel dashboard built for the person who has five minutes and one question.

Executive summary

The indices and the projected margin on one screen, with the direction of travel. The page you forward, rather than the page you explain.

Sprint financials

Expected cost, revenue and the gap between them, phased across the four weeks. Where the money is going, before it has gone.

Predictive analysis

Where the current trend leads if nothing changes, and when each recovering task returns to zero.

Granular data

Every task with its baseline, actuals, current and previous variance, trend, suggested action, and the delay in both working and calendar days.

Pricing

One licence, everything included — fifteen days to judge it

Your purchase price is guaranteed for life, even if the subscription price increases.

€79/ seat / year
  • Delay derivative: trend and diagnosis for every task
  • Calculated recovery date for tasks that are closing the gap
  • SPI, CPI and projected final margin
  • Four-week horizon, recomputed at every status date
  • Excel executive dashboard from a maintained template
  • CSV export of the full granular table
15 days to try it, 14 days to change your mind. The trial runs the complete product on your own plans. If you buy and it is not what you needed, ask within 14 days and you get your money back. Buy GanttDerivata

Prices exclude VAT. Payments are handled by Lemon Squeezy as merchant of record: business invoices and VAT are taken care of at checkout.

Download the free 15-day trial Portable for Windows x64 — unzip and run, no installation. About 97 MB: the .NET runtime travels inside the package, so nothing else needs to be on the machine.

Windows may say it does not recognise this program yet. Check that the publisher is Rosario Rizzo — every file in the package is digitally signed.

What you will see, and how to verify it yourself

FAQ

What everyone asks

What does the tool need from my plan?
A saved baseline and a status date. Without a baseline there is nothing to compare against, and the percentage stays as meaningless as it was before.
How many status dates before the trend means anything?
Two: the derivative is the comparison between the current SPRINT sheet and the previous one. From the second measurement onwards every task carries a direction as well as a size, and the more sheets accumulate the more reliable the recovery rate becomes.
Is a «sprint» the agile ceremony?
No. Here a SPRINT sheet is the measurement taken at a status date, and the method consists of comparing consecutive ones. It works exactly the same on a construction programme as on a software backlog, because it only looks at how the gap moves.
What does it actually tell me to do?
Each task carries a suggested action derived from its trend. Widening means intervene now, because the cause is structural. Stationary means decide whether the shift is tolerable, because the team is not the problem. Reabsorbing usually means wait, and the tool tells you how long the wait will be.
What do I get out of it?
An Excel executive dashboard — summary, financials, predictive analysis and the granular table — plus a CSV export of every row, for anyone who wants to take the numbers elsewhere.
Does it work on a plan with subprojects?
Yes. A master plan with inserted subprojects is read as one schedule: every task of every subproject gets its own variance, trend and suggested action, and the project summary row keeps the totals for the whole programme.
Do I need Microsoft Project installed?
No. The application reads the .mpp file directly and runs on its own — that is deliberate, because the people who most need to check whether a delay is widening are often the ones who received the plan rather than wrote it. GanttDerivata is a standalone Windows application, not an add-in: it never runs inside Project, so there is nothing to install into software you do not control.
Does it modify my plan?
No. GanttDerivata only reads the file and never writes to it — the plan can even stay open in Microsoft Project while you analyse it. What it writes goes elsewhere: the CSV and JSON exports next to the plan, and the variance history in your user profile, which is what makes the trend possible.

Stop chasing emergencies. Start reading the direction.

The size of a delay tells you how bad today is. The direction tells you what tomorrow costs — and, often enough, that the cheapest correct decision is to spend nothing at all.