Two projects, both 10% behind. One needs money today. The other needs nothing.
Every reporting tool measures how late you are, once, at a status date. GanttDerivata measures how that lateness is moving — and the direction tells you something the size never will: whether the plan was wrong, whether something external pushed it, or whether it is already fixing itself. It reads the .mpp file directly, so you do not need a Microsoft Project licence to use it.
You do not need Microsoft Project to read a plan
GanttDerivata opens .mpp files on its own. That matters more than it sounds: the people who most need to know whether a delay is getting worse are usually not the ones who built the schedule, and almost never the ones holding the Project licence.
Open the file, read the trend
A Windows application that opens the .mpp you were sent and reads it directly. Nothing to install inside anything else: no Microsoft Project, no add-in, no server.
The plan stays on your machine
The file is read locally and never uploaded. Whoever sent you that schedule does not need to know you opened it, and your IT department has nothing to approve.
A single measurement can’t tell you what to do
Take a snapshot today and three completely different situations look identical: a task that is 10% behind and accelerating, one that has been stuck at 10% for a month, and one that was 26% behind and is closing the gap. Same number. Opposite decisions.
Money spent where it wasn’t needed
Overtime authorised, a second crew mobilised, a supplier pushed — on a task that was already recovering on its own and would have caught up anyway.
Structural errors left to compound
A duration that was wrong from day one doesn’t announce itself. It just widens, quietly, until the finish date moves and the recovery options have expired.
Blame in the wrong place
A delay caused by a late client approval looks exactly like a delay caused by an underperforming team — until you look at how it moves over time.
The derivative of the delay
GanttDerivata records a SPRINT sheet at every status date and compares it with the previous one. The change in the delay percentage between consecutive weeks behaves mathematically like a derivative: it measures not the size of the problem but its speed and direction. Three signs, three diagnoses, three different decisions.
Widening
3% → 6% → 9% What it provesNot bad luck: a structural planning error. Either the duration originally estimated for the work is wrong, or the resources allocated cannot sustain the rate the contract demands.
What to doCheck the float you actually have, then act immediately. Left alone, the gap only widens — and every week of waiting makes the recovery more expensive.
Stationary
10% → 10% → 10% What it provesThat the team is fine. A frozen percentage means today’s productivity is correct and the resources are adequate: what you are seeing is a pure shift in time, almost always caused before the work began — a late order confirmation, an approval that arrived weeks after it was due.
What to doYou have room to choose. If the task is off the critical path, accept the shift. If it isn’t, add crews temporarily to pull it back — knowing the problem is the start date, not the people.
Reabsorbing
26% → 21% → 16% What it provesThe team is running faster than the plan theoretically requires, and the accumulated time debt is closing by itself. The gap is being repaid at a measurable rate.
What to doUsually nothing — and that is the most valuable instruction the tool can give you. See the calculation below.
The recovery date, calculated instead of hoped for
Once you know the rate at which a delay is closing, the date it reaches zero is arithmetic, not optimism. This is the number that decides whether you spend. The measure underneath it is public work, with limits worth knowing: what Earned Schedule measures, and what it cannot see.
If your contractual milestones can absorb four weeks, the decision is to add nothing: no extra crew, no authorised overtime, no expedited supplier. The project reaches punctuality on its own, at no cost. If they can’t absorb it, you now know precisely how much time you have to buy — rather than buying insurance against a number nobody measured. The whole argument, arithmetic included: the cheapest decision is to do nothing.
Four weeks, because that is the length of a decision
For every task GanttDerivata carries the expected progress, cost, revenue and work forward across the current week and the three that follow. Today’s variance is always measured against a figure that was written down before the week began — and four weeks is far enough ahead to move a crew, renegotiate a delivery or reset an expectation, while still being close enough to be believed.
Are we on time?
Work achieved against work planned. Below 1 the project is behind, whatever the Gantt chart looks like.
Are we spending well?
Value earned against money spent. It exposes the job that is on schedule only because it is burning budget to stay there.
What will we actually make?
Projected final margin, from costs and revenue phased across the horizon. Not the margin you quoted — the one the current run rate is heading towards.
Three things you get with it
The delay trend is the reason to buy it. These are the three that make it usable on Monday morning.
What-if on the dates
One slider — the pace of future progress — and you see the effect at once on the estimated finish, the gap against the schedule and the delay against the baseline, using Earned Schedule. It needs a saved baseline and a status date, and it works even on plans that are only bars: without baseline cost and work the pace is computed on durations, and the window says so.
A Power BI ready JSON
Next to the CSV every export writes a canonical JSON — decimal points, ISO dates — meant to be read straight into Power BI or anything else, without a spreadsheet in the middle.
An Excel dashboard, already built
An .xltx template that hooks onto the exported file and shows progress, variance and earned value indicators. Open it, point it at the CSV, and the charts fill themselves.
An executive dashboard, not a data dump
The analysis lands as an Excel dashboard built for the person who has five minutes and one question.
Executive summary
The indices and the projected margin on one screen, with the direction of travel. The page you forward, rather than the page you explain.
Sprint financials
Expected cost, revenue and the gap between them, phased across the four weeks. Where the money is going, before it has gone.
Predictive analysis
Where the current trend leads if nothing changes, and when each recovering task returns to zero.
Granular data
Every task with its baseline, actuals, current and previous variance, trend, suggested action, and the delay in both working and calendar days.
One licence, everything included — fifteen days to judge it
Your purchase price is guaranteed for life, even if the subscription price increases.
- Delay derivative: trend and diagnosis for every task
- Calculated recovery date for tasks that are closing the gap
- SPI, CPI and projected final margin
- Four-week horizon, recomputed at every status date
- Excel executive dashboard from a maintained template
- CSV export of the full granular table
Prices exclude VAT. Payments are handled by Lemon Squeezy as merchant of record: business invoices and VAT are taken care of at checkout.
Windows may say it does not recognise this program yet. Check that the publisher is Rosario Rizzo — every file in the package is digitally signed.
What everyone asks
What does the tool need from my plan?
How many status dates before the trend means anything?
Is a «sprint» the agile ceremony?
What does it actually tell me to do?
What do I get out of it?
Does it work on a plan with subprojects?
Do I need Microsoft Project installed?
.mpp file directly and runs on its own — that is deliberate, because the people who most need to check whether a delay is widening are often the ones who received the plan rather than wrote it. GanttDerivata is a standalone Windows application, not an add-in: it never runs inside Project, so there is nothing to install into software you do not control.Does it modify my plan?
Stop chasing emergencies. Start reading the direction.
The size of a delay tells you how bad today is. The direction tells you what tomorrow costs — and, often enough, that the cheapest correct decision is to spend nothing at all.