The tools come from the problems.
Twenty years of running projects, and a development team to build the answers properly.
I’m Rosario Rizzo. Project Edge Tools exists because I kept meeting the same problems in Microsoft Project and kept finding no tool that solved them. Knowing the problem, though, is not the same as engineering the answer — so I stopped building alone.
Rosario Rizzo
Project management trainer and consultant · founder of Project Edge Tools
- PMP
- PRINCE2 Foundation
- ISIPM Base & Advanced
- MCTS — MS Project
A career on both sides of the problem
I’m a trainer and consultant specialising in project management methodologies and in the use of Microsoft Project. My career has been dedicated to software development and project management — two decades spanning software analysis and development, and leading teams through complex projects. That double background is why these tools look the way they do: they are designed by someone who has had to deliver with them.
Credentials that back the practice
Since 2003 I’ve earned internationally recognised certifications across the major project-management bodies and the Microsoft Project platform.
PMP
Project Management Professional, from the PMI (Project Management Institute).
PRINCE2 Foundation
The process-based method for structured, controlled project delivery.
ISIPM Base & Advanced
Both levels of the Italian Institute of Project Management certification.
MCTS — MS Project
Microsoft Certified Technology Specialist for Microsoft Project.
One person can name the problem. It takes a team to build the answer.
I know what a plan should do and where it goes wrong — that part is twenty years of practice. But recognising a problem is not the same as engineering software that holds up on someone else’s machine, with someone else’s data, for years. So I built a team of developers around these products: Maria, Erik and Prakesh.
- RRosario
- MMaria
- EErik
- PPrakesh
We work as a virtual team: four people in different places, on the same products. That is not a compromise we settled for — it is what lets the right skills be on a problem regardless of where they happen to live, which is exactly the point of building this way.
The domain knowledge
Which problem is actually worth solving, what a project manager will really do with the answer, and where a plan quietly breaks. That comes from the field, not from a specification.
The engineering
Developers whose craft is software, not project management: the people who make a tool read an awkward file without losing anything, survive the next Windows update, and behave the same on the hundredth plan as on the first.
The combination
Only by bringing different skills and different experience together do you get the software people have been missing. On their own, a developer builds the wrong thing beautifully and a project manager builds the right thing badly.
The question nobody asks out loud
Before a PMO adopts a tool, someone always wonders the same thing: what happens to it in three years? It is a fair question, and a team behind the products is the honest answer to it.
The tools keep moving
Microsoft Project changes, Windows changes, Power BI changes. Keeping up with all of that is continuous work, and here it is somebody’s job rather than an evening hobby.
Support reaches the people who wrote it
When you report something, it goes to the team that owns the code — not to a first-line script, and not into a queue between departments that have never opened the product.
What you ask for can be built
Several of these tools started as a request from someone doing the work. With developers on the team, a good idea from a client can become a released feature instead of staying a nice thought.
Still in the room where projects are run
The software is not the whole business, and that is deliberate: staying in training and consulting is what keeps the products honest. It is also where the next problem gets spotted.
Professional training
Project-management methodology courses and certification tracks — PMP, CAPM, ISIPM Base and ISIPM Advanced.
Consulting on the platform
Training and support on Microsoft Project, and on open-source alternatives such as ProjectLibre.
Making teams effective
Guiding teams into project-management methods that work for them, with coaching and periodic reviews so what was taught actually sticks.
Tell us what your projects are missing.
If a tool on this site nearly does what you need, or if the thing you need is not here at all, say so. Those conversations are where most of these products came from.
or write to info@projectedgetools.com