Microsoft Project plans well. Everything around it is manual.
Checking a schedule you didn’t write. Stripping client names before you send it. Chasing progress by email. Getting the plan into Excel or Power BI. Project Edge Tools turns each of those into one click.
- Everything runs on your machine
- Windows desktop, no server
- Buy one, or the ones you need
The plan is the easy part
Microsoft Project is very good at holding a schedule. It is close to useless at everything that happens once that schedule has to meet other people — and that is where planners actually lose their weeks.
You can’t trust what you receive
A contractor sends a plan. It looks fine. Nothing tells you a quarter of the tasks are pinned by constraints or that the critical path is broken.
You can’t safely send what you have
Every .mpp carries client names, hourly rates, costs, baselines and the notes where the honest remarks live. There is no «share safely» button.
The status update eats the week
Progress arrives as emails, screenshots and half-filled spreadsheets. Retyping it into the plan is where the hours go, and where the errors enter.
Six desktop tools for Microsoft Project, one problem each
No suite lock-in and no bundle you have to swallow whole. Each tool solves one job completely, is licensed on its own, and works whether or not you own the others.
OneClickExporter
Standalone — no Project needed
The bridge to Power BI. A CSV export with stable, predictable columns, so your dashboard refreshes instead of breaking every month.
- Built for Power BI ingestion
- Time-phased data included
- Handles master plans and resource pools
Feeds OneClickReport, the ready-made Power BI dashboards — sold separately. See OneClickExporter
GanttShield
Own app — Project for .mpp only
Share your plans without leaking client names, rates, costs and private notes. One click produces a sanitized copy next to the original, which is never touched.
- Tasks and resources become stable IDs
- Costs, baselines and notes wiped in one pass
- Structure and dates stay readable
GanttTimesheet
Own app — needs Project
The whole timesheet cycle in one application: send the assignments, import the actuals that come back, approve them line by line, and write them into the plan. Nobody but you opens Microsoft Project.
- Approve row by row before anything lands
- Three timesheet formats, six languages
- Attaches to the plan you already have open
SendTask
Standalone — no Project needed
Email every resource their own task sheet, filtered to just their work. It reads the plan file directly, so the machine that sends the assignments does not need Microsoft Project at all.
- One filtered Excel sheet per resource
- Percent complete or day-by-day work
- Validated import with a full log
MppToExcel
Standalone — no Project needed
Hand the plan to people who live in Excel. A full task table plus a Gantt drawn in cells — and a workbook that speaks six languages.
- Gantt bars drawn as cells, four timescales
- Cost data is opt-in, never on by default
- Export only: the .mpp is opened read-only, never touched
GanttDerivata
Standalone — no Project needed
Two plans both 10% behind look identical in a snapshot. GanttDerivata compares consecutive status dates and tells you which delay is widening, which is stuck, and which is closing by itself.
- Widening, stationary or reabsorbing, per task
- The date a delay reaches zero, from its own rate
- Excel dashboard: schedule, cost and revenue
The same three promises, in every tool
Local by design
Your schedules stay on your machine: no cloud, no upload and no account to create. The tools go online for licence activation and, in applications with an About window, for a check for new versions that sends nothing about you and can be switched off. SendTask and GanttTimesheet send email only when you ask them to, from the mail account you set up.
Where you already are
Nothing here lives in a browser tab. Every tool runs as its own Windows application, and OneClickExporter, MppToExcel, SendTask and GanttDerivata go further and read .mpp files directly, for the people who receive schedules but don’t own a Project licence.
Install and go
Windows 10 or 11, per-user installation, no administrator rights and no server components. Licences are per seat, with an offline grace period and self-service deactivation.
Anyone whose week is shaped by an .mpp file
- Planners and schedulers
- PMOs screening contractor submissions
- Owners and client-side teams
- Project controls and EVMS
- Consultants reviewing other people’s plans
- Site managers reporting progress
Before you ask
Do I have to buy the whole suite?
Do I need Microsoft Project installed?
.mpp files directly and need no Project installation — that is deliberate, because the people who most need to work on a schedule are often the ones who didn’t write it. GanttTimesheet runs as its own app but drives Project, so Project has to be installed. GanttShield needs it only to write the .mpp copy: its .xml copy works without Project. Every tool in the suite is a desktop application: none of them lives inside the Project ribbon.Is anything uploaded to a server?
Can these tools damage my plan?
What do I need to install?
Can I try before buying?
Pick the one that fixes your worst hour of the week.
Start with a single tool. If it earns its place, the others are waiting — and none of them will ever ask you to move your plans to somebody else’s server.
- Windows 10 / 11
- Per-user install, no admin rights
- Licences per seat, invoices handled at checkout